Langara College has a 25-year master plan to expand its campus. Phase 1 began in 2007, with construction of a new Library (2007) and Students' Union Building (2009). In 2009, Langara College put out an RFP to architectural firms to develop schematic designs for phases 2 and 3. In 2012, the CD1 text amendment was approved by the City of Vancouver to amend the policy statement allowing for a revised placement of new buildings on campus.


2005

The Langara College Policy Statement was adopted by City Of Vancouver to guide future development of new buildings. 

master text plan

 Master Site Plan

2007 and 2009

  • A new Library and Students’ Union building were constructed as phase 1 of the master plan.

2009

  • Langara puts out an RFP to architectural firms related to schematic design for phase 2 and 3 of the Campus Master Plan as outlined in the Langara College Policy Statement.
  • Teeple/Proscenium Architects were the successful firm.

October 30, 2012

The CD1 text amendment is approved by the City Of Vancouver to amend the policy statement allowing for a revised placement of new buildings on campus.  

picture 2


Master Site Plan II

This text revision changes the proposed development of a Creative Arts building in the northwest corner of the site to a Science & Student Services building and changes a proposed multi-purpose building in the southwest portion of the campus to a Creative Arts building.

creative arts building
Proposed Creative Arts building

science building

Proposed Science & Student Services building (later developed into the Science & Technology Building)